| Item | Parameter | Item | Parameter |
| ①Basic Info. |
| Overall Dimensions (L×W×H) | 9600 × 2550 × 3450 mm | Load Capacity | 16 / 21 tons |
| Transport Package | Bare painting and waxing treatment | Transportation | Ro-Ro / Bulk ship / Container vessel |
| Production Capacity | 100 units/month | Tare Weight | Approx. 11570kg |
| Origin | Hubei, China | Delivery Time | Within 30 days |
| ②Chassis Specification |
| Chassis Brand | Dongfeng | Model | DFL1250A8-K01Y-981-012J |
| Drive Wheel | 6×4 | Wheelbase | 4350+1300 mm |
| Cabin Model | Dongfeng standard cabin | Driving Position | LHD or RHD |
| Cabin Seats | 3 | Cabin Color | According to customer requirements |
| Engine Model | DCEC C260 33 | Emission Standard | Euro II / Euro III / Euro IV / Euro V / Euro VI / Customized to specification |
| Engine Rated Power | 191 kW | Engine Horsepower | 260 HP |
| Engine Max Torque | 1025 N·m @ 1400 rpm | Engine Number Of Cylinders | 6 |
| Engine Displacement | 8.3 L | Transmission Model | RT-11509C |
| Pto | yes | Forward Gears | 9 |
| Reverse Gears | 1 | Transmission Type | Manual / Automatic |
| Synchronized | Yes | Transmission Gear Ratios | Forward: 12.42, 8.62, 6.08, 4.53, 3.36, 2.47, 1.81, 1.35, 1.0; Reverse: 12.99 |
| Front Axle | Load capacity 7 tons | Rear Axle | 10 tons × 2 |
| Axle Gear Ratio | Single reduction, ratio 5.143 | Tire Specification | 11.00R20 18PR |
| Front Suspension | 8-leaf spring | Rear Suspension | 9-leaf spring |
| Fuel Tank Capacity | 350 L | Fuel Tank Type | Steel fuel tank |
| Electric System | 24 V | Brake Type | Front and rear drum brakes |
| Braking Method | Air brake, air cut-off brake, ABS | | |
| ③Upper-Body Specification |
| Tank Volume | 21000 L | Fuel Tank Truck Tank Material | Carbon steel or aluminum alloy or stainless steel |
| Fuel Tank Truck Dished Head Thickness | 6 mm | Fuel Tank Truck Number Of Compartments | 2 to 6 compartments, or customized as required |
| Emergency Bottom Valve | Aluminum alloy / Stainless steel | Discharging Valve | 3", 4" or 6" diameter |
| Oil Pump | YHCB/80/60, 50 m³/h | Manhole | DN450 (18 inches) |
| Liquid Line | DN50 (2 inches) | Filling Hose | 15 m |
| Top Safety Rail | 1 set | Oil Gas Recovery System | Optional |
| Fuel Dispenser & Hose Reel | Optional | | |